And you may eventually end up with a... very expensive... hut.
This from a blog:
The Environment Agency - Science Report - The economic and environmental benefits of resource efficiency in construction
Resource efficiency could save construction industry millions
Ten million tonnes of new construction products are wasted every year, at a cost of over £1.5 billion. This is the result of a study by the Environment Agency to evaluate the potential economic and environmental benefits of the UK construction sector improving resource efficiency. This is equivalent to about two per cent of the overall construction sector output. Reducing the amount of waste by one per cent would mean annual savings of £15 million and 104,000 tonnes of product.
The report estimates that 6.1 million tonnes of construction waste, mainly paints and finishes, floor coverings and light fittings, are sent to land fill every year, at a cost of £917 million. It also estimates that 3.9 million tonnes of construction waste such as ceramics, concrete and cement, worth £583 million are recycled.
The construction sector is hugely resource intensive, using an estimated 400 million tonnes of resources each year. This makes it the single biggest user in the UK economy, accounting for about nine per cent of gross domestic product. In addition, the sector also produces over 30 per cent of England's total waste along with 32 per cent of its hazardous waste.
As Site Waste Management Plans become mandatory for larger projects from April 2008, it is becoming increasingly important that the sector efficiently manages the resources and waste products from all processes during construction projects.
During this project the EA developed scorecards that can be used as a quick and easy tool for identifying opportunities and improvements for site waste management. Separate scorecards have been developed for new build, refurbishment and demolition projects. They are designed to be used by clients, contractors, waste management companies and the Environment Agency to benchmark the performance of on-site waste management.
The report recommends that the construction sector works together with a common goal of resource efficiency*. For this to happen, each part of the sector needs to understand its role in terms of the resources it buys that are subsequently wasted and apply appropriate solutions. Better data is required at a product level for this to happen effectively.
I haven't read the report, nor do I have time to, but from the summary it surprises me that we are still today seeing such as this, and the stark warnings on waste being issued, when the likes of WRAP, NISP , Knowledge Transfer Network and I am sure many other well-funded and often overlapping bodies/quangos (who must have been mentioned) have surely been on this case* for a long time now? Heck, I am on so many lists now I am sure this may be from one of them!
Is national coordination so fragmented/poor and, possibly answering my own question before, is progress really this slow?
*'The report recommends that the construction sector works together with a common goal of resource efficiency.' - So... are they saying that they currently are not then? I really am flummoxed. There is tons going on with this aim/target already!
1 comment:
So, once they implement the Site Waste Management Plans for the Olympics sites in North London, the cost, from the existing £9.3 Billion, is going to become what ............ £10.5 Billion?